Every unit is engineered against your gas or water analysis, fabricated in our Jinan workshops in PP, stainless or coated steel, and tested before it ships. Mix air-side and water-side equipment in one order.

Spray Scrubber Towers
Corrosion-proof PP packed towers absorb acid and alkali fumes, ammonia and soluble odors. Multi-stage designs with caustic or hypochlorite dosing reach strict stack limits, and every tower is water-tested before shipping.
Specs: 1,000–100,000 m³/h · 1–3 packing stages · 90–99% soluble-gas removal (design dependent) · PP body, PVDF internals optional
UV Photolysis & Photocatalytic Units
High-output UV-C lamps crack VOC molecules and generate ozone that oxidizes odor compounds in-duct — no chemical consumption, near-zero pressure drop, and instant on/off with your process. The right first stage for paint, printing and food-processing exhaust.
Specs: modules 5,000–50,000 m³/h · SS304 housing · lamp life ~8,000 h · TiO₂ photocatalyst option · pairs with carbon polishing


Activated Carbon Adsorption Systems
Drawer-type and fixed-bed adsorbers loaded with pelletized carbon capture the VOC fraction that survives upstream stages. Differential-pressure ports tell you exactly when to change carbon, and drawers slide out for a change-over measured in minutes.
Specs: carbon 0.2–10 m³ · PP or galvanized housing · impregnated carbon for H₂S/mercaptans · replacement carbon supplied
Dissolved Air Flotation (DAF) Units
Micro-bubbles float oils, grease and suspended solids to the surface where a chain scraper skims them off — the standard pre-treatment for food, slaughterhouse, textile and car-wash wastewater. Ours ship as complete skids: saturation pump, dosing points, scraper and controls.
Specs: 1–100 m³/h · SS304 or coated steel · 60–95% SS/oil removal with coagulation · PLC auto operation


Packaged Wastewater Treatment Plants
A complete A/O or MBR process sealed inside one buried or skid-mounted tank: anoxic and aeration zones, clarifier or membrane rack, blowers and controls. Sized for workshops, camps, resorts and villages that need discharge-grade water without building a treatment plant.
Specs: 1–200 m³/day · carbon steel with anti-corrosion coating or SS · A/O, A²/O or MBR process · effluent to GB 18918 / local discharge standards
Dosing Systems & PP Tanks
PAM, PAC, caustic and hypochlorite dosing skids built around our own PP tanks — with agitators, metering pumps, calibration columns and pH/ORP control. Because we extrude and weld the tanks ourselves, odd volumes and footprints are never a problem.
Specs: tanks 50–5,000 L · single or duplex pumps 1–1,000 L/h · auto pH/ORP control · pre-piped, pre-wired, wet-tested

Send a gas or water analysis — get an engineered proposal, not a catalog PDF.
WhatsApp / WeChat +86 186 1558 6932 · jinhaofeng298@163.com